Purpose

This report provides a history of indirect cost rate/schedule and calculation changes that have been made to an award and/or task.

Frequency

This report should be run as needed to verify a change or reconcile an account.

Responsibilities with Access

Setting Report Parameters

The following table describes the required and optional parameters to use to run the report:

Parameters

Description
(click in the field to see the List of Values)

Optional Parameters

Award

The number associated with the award that is funding the projects and tasks

 

To generate the report for a specific award within a given location, enter the award number or select from the List of Values. Running by Award Number will generate reports for all projects funded by that award. For a specific Project funded by the award, enter the Project Number as well.

 

To generate the report for all awards within a given location, leave this parameter blank. To generate for all awards and projects, leave both Award and Project parameters blank.

Project Number

The number associated with the project

 

To generate the report for a specific project with a given location, type in a Project Number or select from the List of Values. Running by Project Number will generate reports for all awards funding that project. For a specific Award funding a project, enter the award number as well.

Understanding the Output

The following table describes the report output:

Column Heading

Description of Column

Date Changed

The date the change was entered in Oracle.

Calculation Period Award

The calculation period for indirect costs on award.

Award Rate

The indirect cost override rate on award.

Award Schedule

The burden schedule name on award.

Calculation Period Task

Calculation period for indirect costs on task. This field is conditional. If the field in Oracle is not populated, this will be blank.

Task Rate

Indirect cost override rate on task. This field is conditional. If the field in Oracle is not populated, this will be blank.

Task Schedule

Burden schedule name on task. This field is conditional. If the field in Oracle is not populated, this will be blank.

Helpful Tips

Effective Date: 3/14/2007 8:48:00 AM